Lean Six Sigma for supply chain management : (Record no. 673)

MARC details
000 -LEADER
fixed length control field 01566cam a22003137i 4500
001 - CONTROL NUMBER
control field 18333873
003 - CONTROL NUMBER IDENTIFIER
control field OSt
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20250420134821.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 141014s2014 nyuad 001 0 eng d
010 ## - LIBRARY OF CONGRESS CONTROL NUMBER
LC control number 2014469239
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9780071793056
035 ## - SYSTEM CONTROL NUMBER
System control number (OCoLC)ocn877950631
040 ## - CATALOGING SOURCE
Original cataloging agency MOZ
Language of cataloging eng
Transcribing agency KCST
042 ## - AUTHENTICATION CODE
Authentication code lccopycat
050 00 - LIBRARY OF CONGRESS CALL NUMBER
Classification number HD38.5
Item number .M374 2014
082 04 - DEWEY DECIMAL CLASSIFICATION NUMBER
Classification number 658.7
Edition information 23
Item number Ma Le
100 1# - MAIN ENTRY--PERSONAL NAME
Personal name Martin, James W.
Fuller form of name (James William),
Dates associated with a name 1952-
Relator term author.
9 (RLIN) 5277
245 10 - TITLE STATEMENT
Title Lean Six Sigma for supply chain management :
Remainder of title a 10-step solution process /
Statement of responsibility, etc. James W. Martin.
250 ## - EDITION STATEMENT
Edition statement Second edition.
260 #1 - PUBLICATION, DISTRIBUTION, ETC.
Place of publication, distribution, etc. New York :
Name of publisher, distributor, etc. McGraw Hill Education,
Date of publication, distribution, etc. 2014.
300 ## - PHYSICAL DESCRIPTION
Extent xxix, 395 pages :
Other physical details illustrations, charts ;
Dimensions 24 cm
500 ## - GENERAL NOTE
General note Includes index.
505 0# - FORMATTED CONTENTS NOTE
Formatted contents note Using Lean Six Sigma methods to identify and manage supply chain projects -- Deploying Lean Six Sigma projects using Lean tools -- Demand-management impact on Lean Six Sigma projects -- Lead-time impact on Lean Six Sigma projects -- Lean Six Sigma applications to manufacturing resource planning -- Identifying Lean Six Sigma projects using inventory models -- Lean supply chains and third-party logistics -- Root-cause analysis using Six Sigma tools (with operations research methods) -- Lean Six Sigma improvement and control -- Supply chain design for excellence -- Appendix: Important supply chain metrics.
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Business logistics.
9 (RLIN) 5278
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Six sigma (Quality control standard)
9 (RLIN) 5279
650 #0 - SUBJECT ADDED ENTRY--TOPICAL TERM
Topical term or geographic name entry element Quality control.
9 (RLIN) 2286
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Koha item type Book
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Dewey Decimal Classification
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Date acquired Cost, normal purchase price Total checkouts Full call number Barcode Date last seen Cost, replacement price Price effective from Koha item type
    Dewey Decimal Classification     KCST Library KCST Library 13/10/2021 12.82   658.7 Ma Le 1000000869 13/10/2021 12.82 13/10/2021 Book
© 2025 KCST. All rights reserved